On Thu, Oct 9, 2025 at 10:17 AM Jorge Saguinsin <jorge@holygardens.ph> wrote:
To: The Board of DirectorsSubject: PROPOSED SYSTEM OF INTERMENT AT HMMG HAMP, Mechanization and computation of ROEcc: MRSS, HAMPPLEASE READ WELL AND UNDERSTAND. La Union read you are next.This post suggests and proposes:Objective:1. Make interment efficient;2. Achieve better returns for investmentWhat1. To mechanize the interment operations and base this at HAMP1. Purchase a backhoe a PC 30: finance this internally2. Hire a driver- operator for the backhoe and truck3. Assisted by a helper4. Backhoe and DT travel to4. But vault manufactured in HMMG to save on wear and tear2. Procedure and system:1. We purchase these two machineries:1. A pc 30 excavator (this is for cat, however another supplier Hadaam can provide at P700,000!AZAAN - P870,000 with breaker and breaker points free delivery from Guaga P870,000.00Finance internally, 30% dp, 70% ma P20,000 at 12% pa 36 monthsWe order the one with rubber track to save on concrete and grass; or use rubber tracks or have a trailer iwithinDP 870,000 x 30% P261,000 (from SBU funds)Balance 870,000 x 70% 609,000MA 609.000 x 136/36 = 828.24/36 23,006Interest 209,240.00Total cost for the excavator . 1,079,740,002. A sino truck or howo bn DT with 5 cu meters capacity, 2.5 meters cargo door to accommodate a pc 30 , 35, o4 3excavatorPrice 1,150,000 1,150,000DP 30% 345,000Balance 805,000 x 1.36/36 = 1,094,800/36 30,411.00Interest expense: 289,800Total 1,439,800.00A sino 5 cubic meter DT will enable us to do the folloiwng:1. Load the backhoe from HAMP for HMMG2. Load a vault from HAMP to HMMG3. Transport tent, chairs and personnel from HAMP and HMMGTotal cost of project 2,,519,540.00MA for both:Excavator 23,006DT 30,41153,417 x 12 641,004Estimated savings P1,400/interment x 40 (a high for both HMMG and HAMP) since you can accept moreinterments (vs predicted digging cost of P3,000 per)Savings of 2 gt for HMMG 16k x 2 x 13 = 416,000Total cost savings Total 1,057,400,002. Proposed system:1. Vault forms will be provided for in HMMG - Assemble one set of vault form (Make a PO now) P30,000k?)2. Contractor manufacture vault in HMMG 5-103. We purchase one big tent PO now how much? (P40,000?)4. As back up we order 4 trailers (x 90,000 ?) 360,000Total 430,000.005. Our expenses for the labor in backhoe is a driver operator say P700 - 800 per day6. When there is interment in HAMPWS is sent to the driver operator to operate backhoe: Lot number block number, somebodytrains him locate, or a supervisor points to the lotDigging is done according to standard, There is a helper to remove stray oil being excavatedMaybe another GT or ISG on call1/2 of digging is dumped at our designate dump site1/2 of the digging remains at the dump truck They will be dumped back at the interment at end of ceremonyIf there are additional interments, 1/2 of soil is dumped at plywood mixing board; to be picked up later by backhoe.In excess of onte interment, the operator gets addiitional P250,00 thehelper P100.00ISG focuses on the interment ceremonies.7. When there is interment at HMMG1. Driver operator is given a trip ticket to bring the excavator to HMMG, with designated block and lot number to dig;2. Driver operator travels to HMMG In excess of onte interment, the operator gets additional P250,00 thehelper P100.003. Driver operator digs the hole; dumps 1/2 of soil at dumpsite, 1/2 remains.4. ISG lowers the vault5. When there isi no vault at HMMG (this preventable) we can load and transport vault to HMMG using the HOWO dt4. ROI computation1. Estimated total savings vs manual1. Labor savings P1,400/interment x 40 (a high for both HMMG and HAMP) s ince you can accept more interments (vs predicted digging cost of P3,000 per)53,417 x 12 641,004Savings of 2 gt for HMMG 16k x 2 x 13 = 416,000Total cost savings Total 1,057,400,00a. ROI for actual savings 1,057,400.00/ Total investment 2,519,400 = 41.96% paRule of 72 72/41.9 = 1.7 yearsb. ROI with depreciation Dep /year 2,519,000 /5 P503,800.00Add to savings 1,057,400.00Total savings = 1,561,200.00ROI + Dep 1,561/ 2,519.4 = 61.9%Rule of 72: 72/61.9 1.16 yearsCONCLUSIONS;1. This is really better than PHP in the bank this generates more PHP in the years to come, making intermrent more profitable2. Thats why FL ordered 30 for its 43 branches; their excavators cost P2M each: Kato3. We definitely should do this now. Make a reservation for Azaam or see Hamad with P700,000 for PC 30
4. As of now, labor savings is considerable and must be saved primarily. Resort to outsourcing mechninization and automatgion
You tube tips on operating a mni excavator
No comments:
Post a Comment