Road:
Goal hindi puputok, hihiwalay
Tambak: thickness
Base coarse: thickness
Dowels: size, spacing
Expansion joint distance, and sealants (to be concrete cutter), to be cut diagonally every x meters
Contraction joint: every 75 meters (specs)
Method of curing; curing time (we use poly ethylene sheet; -steam curing
Method of scoring;
Width;
Formworks
Time of pouring - coolest time of the day
No hairline cracks from too much heat; no overmix;
Compaction
Thickened edge near manholes (by two inches) and near elevated sections or intersections;
Y shape on intersection rather than right angle.
Goal: walang water pond after 30 minutes of rain
Gutter:
Dimension; height, width of the palad, width of the vertical portion; angle of the palad
L type, S type
Dowel
Manhole:
Dimensions height width, flooring, mortar
Intervals
Manhole cover specs:
Inlet: size
Our gratings: dimensions, construction
Drainage:
Size;
One side ba; two sides ba
Intervals of cross pipe
My beddings ba/support?
Grade of road carriage way.
Kailangan ba protection from below the pavement scouring or leak from the pavement?
No comments:
Post a Comment