Wednesday, January 14, 2026

Process Digging a grave. - how to ? KEEPING IT SQUARE AND STRAIGHT

Providing outstanding amazing values through process clarity and improvement


1.   Mark with a white paint the lay out as specified by CSS or project engineer
2.  Go easy as you scrape the top soil or grass;   save the grass;
3.   Keep the digging square and straight
      1.  Use the left joystick and position the bucket straight down
      2.  Same as near end
3.  Be careful as you dig near the proximal end (side near you)  If you hit a stone you could be pulled down

4.  Learn how to scrape straight at the bottom

5.  After digging the 2 ft, for a 2 ft digging, start dumping the excess for the truck to dispose
                                  4 ft, for a 7 ft










 The contents are property of the author and shall not be used without written consent

No comments:

Post a Comment