Showing posts with label lot. Show all posts
Showing posts with label lot. Show all posts

Wednesday, November 5, 2025

Re: PNL understanding, thin lot GP and why there is a need for prudent and frugal operations management



On Wed, Nov 5, 2025 at 6:59 AM Jorge Saguinsin <jorge@holygardens.ph> wrote:



 


Hi All,

This email outlines the fundamental principles of fiscal discipline and the necessity of prudent financial management and resource conservation within our business.

1. **Basic Business Formula: Sales - Cost = Gross Profit**
Our core objective is to consistently increase sales while simultaneously reducing costs and expenses. These are the primary drivers of our business, ensuring salaries are paid and operations are sustained. Unlike government entities, we must diligently account for every peso spent, as our revenues are not guaranteed.

2. **Break-Even Analysis of a Sales Transaction**
To illustrate, let's analyze the deductions from each sales transaction:

* **Standard Deductions (52% of Transaction Value):**
* VAT: 12%
* Memorial Care Fund: 15%
* Marketing Expense: 15%
* Collection Fee: 5%
* Insurance: 5%
* **Total: 52%**

* **Joint Venture (JV) Share:**
* Ranges from 40% to 50% (potentially higher if the land was purchased).

* **Development Cost (P3,500/sqm, potentially higher at current costs):**
* Lawn: P8,750
* SSN: P35,000
* GE: P105,000

**Example Application (for a lot previously sold at P60,000 during a promotion):**

* Total Selling Price (TSP): P60,000
* Less 52% Deductions: P31,200
* **Net Gross Profit:** P28,800
* Less JV Share (e.g., 50%): P14,400
* Less Cost of Goods Sold (COGS): P8,750
* **Gross Profit (GP): P5,650**

This P5,650 represents the margin available to cover our operating expenses. In this example, the profit margin is 9.4% (P5,650 / P60,000).

    Break even computation:

            Using 5,650 as margin as base:

           Monthly OE   (Estimate

                          Telephone:                              P2,000
                          Electricity                                 10,000
                          Water                                        20,000
                          Security F                                 25,000
                          Staff salary    6 x  16                96,000
                         Executive salary                        30,000

                         Total                                          183,000

                        BE  =   183,000/5,650              32 lots

                       This means for the entire year to break even we have to have 32 x 12 =     384!!!   Our target of 100, 200, 300 are not enough to break even!

                       Thus as seen from reality/background:    wherein we had 1 sale, 10 sales,     

          To address this PNL issue:

          1   We have to increase sales by:

                Increasing sales

               1.  Asking for marketing plan
               2.  Increasing TLP

                   In HGOMP our former price of P75,000 is way below the competitors P150,000  same as in HGGMP

                Reduce cost:

             1.  Make our marketing events relevant to achieve sales;    Marketing is at "AT A PROFIT"
                 One sbu spent P190,000 for Marketing Event

            2.  Keep labor costs to a minimum;    

            3.  FInd the leaks the small holes where expenses are leaking

 Anyone;    please show computation on the contrary that we are making profit
                  is there a substitute for the formula -  sales- cost  =  GP,   BE  =  Total expenses/ GP plot

OTHERWISE WE SEEK ABCD FROM EVERYONE

                                   

Best regards,
Jorge Saguinsin

Thursday, August 28, 2025

Process - Lot monumenting

Providing outstanding amazing values through process clarity and improvement 

Goal  1.  To systematically mark on the ground the plots for sale
          2.  To extend the usefulness of VSR, in the absence of Technical Description
'               and TCT for customers and diggers/ISG

Background:
         There were no monuments in previous projects.  Thus developed a series of crooked interments,
 wrong interments and lots that did not fit.  There were no monuments.

WTDN next

        The PO was instructed to do the monuments but did not pursue this.   The staff of HAMP tried this but did not pursue.  The monuments cracked.  

Process owner:   Project Officer and/or Engineer

Materials needed:
      1.  Maps (sales map with numbering)
      2    Decision on interval of monumenting
      3.  PVC pipe 1,5 inch diameter cut to  6 inches length
      4.  Dowel of 12 inches with pointed tip and round 1 1.5 metal top for marking of lot number
      5.  Tool for embossing numbers (available at Lazada)


Steps                                                                           Keypoints

1.  Cut the  pvc point   every 6 inches                       1.   Any color will do.  The thinnest will do

2.  Cut 8 mm rebars every 10 or 12 inches                2.  Cut one end at an angle so that it is pointed

3.  Weld on the other free end a 1.5 diameter cap     3.  Weld securely

4.  Pour concrete with sand and 3/4 inside               4,  Cure properly at dry place for 14 days
     the pvc   

5.  Marking decide every five or 10 lots                     5.  Mark a cross on the cap
                                                                                        On the edge of the road mark the 5. 10 15
                                                                                        corresponding to the side  of the cross
                                                                                        For inner plots, the 4 sides with number

6.  Bury the monuments at the correct site               6.  Measure 1 meter or 2.5 meters as needed
      as per VSR                                                          7.  Suggested depth 2 cm, cover with soild

7.  Locate the monument when the lot is to be         8.  Use a magnetic compass or metal detector to
                                                                                        relocate monument
     used
















 The contents are property of the author and shall not be used without written consent