Process - Lot monumenting

Providing outstanding amazing values through process clarity and improvement 

Goal  1.  To systematically mark on the ground the plots for sale
          2.  To extend the usefulness of VSR, in the absence of Technical Description
'               and TCT for customers and diggers/ISG

Background:
         There were no monuments in previous projects.  Thus developed a series of crooked interments,
 wrong interments and lots that did not fit.  There were no monuments.

WTDN next

        The PO was instructed to do the monuments but did not pursue this.   The staff of HAMP tried this but did not pursue.  The monuments cracked.  

Process owner:   Project Officer and/or Engineer

Materials needed:
      1.  Maps (sales map with numbering)
      2    Decision on interval of monumenting
      3.  PVC pipe 1,5 inch diameter cut to  6 inches length
      4.  Dowel of 12 inches with pointed tip and round 1 1.5 metal top for marking of lot number
      5.  Tool for embossing numbers (available at Lazada)


Steps                                                                           Keypoints

1.  Cut the  pvc point   every 6 inches                       1.   Any color will do.  The thinnest will do

2.  Cut 8 mm rebars every 10 or 12 inches                2.  Cut one end at an angle so that it is pointed

3.  Weld on the other free end a 1.5 diameter cap     3.  Weld securely

4.  Pour concrete with sand and 3/4 inside               4,  Cure properly at dry place for 14 days
     the pvc   

5.  Marking decide every five or 10 lots                     5.  Mark a cross on the cap
                                                                                        On the edge of the road mark the 5. 10 15
                                                                                        corresponding to the side  of the cross
                                                                                        For inner plots, the 4 sides with number

6.  Bury the monuments at the correct site               6.  Measure 1 meter or 2.5 meters as needed
      as per VSR                                                          7.  Suggested depth 2 cm, cover with soild

7.  Locate the monument when the lot is to be         8.  Use a magnetic compass or metal detector to
                                                                                        relocate monument
     used