Showing posts with label improvement. Show all posts
Showing posts with label improvement. Show all posts

Thursday, July 2, 2026

Improvement in communcations coding gmails

Providing outstanding amazing values through process clarity and improvement







o:     ALL   

Thru;   Madel  (FOR COMMENTS AND MODIFICATION If no reply in 48 hours deemed in compliance)

SUBJECT:      H22026 FUP1 AF  JV sharing and FUNDS REMITTANCE

 Goals:    1.   To up teamwork cooperation, working as 1
               2.    To produce better and faster results



  Background:

            1.  People are now answering mails and text;   we need better tracking and monitoring people must be made aware that  rewards and penalties are relevant to
                this area

            2. Many have been called out and no respect

            3.  It is alleged and reported (and found out) that staff are:

                 1.  Engaged in bashing and trash talk using our paid chananesl during working hours
                 2.  Many tasks and learning projects remained undone

           4.  People have varied loyalty, we have conflicting orders.  While we have drawn an organizational chart

           5.  We have noted, informal, friendly with some officers  (palakasan stuff) ancillary jobs, with main jobs being undone or neglected


WTDN

       1.  Memos will be numbered date sent and answered duly noted

           Numbering system:       H22026   (type of Memo)     (tag)

                                                H2 -  2nd half

                                               2026 year

                                               Type of Memo

                                               FUP  follow up
                                               FA  for action
                                               FIA for immediate action
                                               FL  for learning
                                               FR  for reports

            Soon may qr code tayo when responding

       2.  Deductions will be made in the monthly performance evaluation and accordingly promotions will be made on various areas as attitude and job behavior which includes
            communication with weight of 5.   Late -0.5, non answering for 2 days or more  less1.0.   This deduction will eat up other weights

           We begin this July

      3  On the performance evaluation:

               below 85%  -   0 movement or removal from the rolls
                 85 -   90  -      1.  salary grade

                 91     95          1.5 grade

                 96   up            2.0 grades


                                     Grade spacing:     

                                     STAFF -                         Php    1,000

                                     SUPERVISORY                      2,000

                                    Managerial                              5,000

    4.   Others
      
         1.  FOCUS ON AIM -  the goal, the KRA  sales and collection

         2.  Use compnay gmail and cp -   keep your personal cp elsewhere:   not games and chats 

         3.  No more surreptitious gcs  If you get caught (and we have discovered some)

         4  Let us be serious and be compliant  NO LANGINAN ETC

         5.  Answer gmails and dm ASAP NOW;     answer phone not later than 3rd ring

         6.   READ WELL AND UNDERSTAND -  no hinapyawan and scanned   You are not a scanner or manghahapyaw.  YOU ARE PAID PROFESSIONAL EMPLOYEE

         7.  Strove to comply with the organizational chart:

              1.   Follow lines of communication, lines of direct reports
              2.  Huwag isasama sa loop ang taong hindi kasama sa converstion (like ay Ical)
              3   Gawin ang nararapat sang ayon sa organizaitonal chart at job description (admin plan

        7.  Don't acknowledge or note a gmail/memo (ONLY BOSS DOES)   INDICATE ACTION.  ID WHO ANSWERED

       8.  Listen and understand

            1.  Intindihinng mabuti ang nasusulat
            2  Magtanong sa mga nakakaintindi ng Ingles, at itransalate ito.
            3.  TIGILAAN ANG PAGHAPYAW AT PAGSCAN.   BASAHIN AT LIMIIN (reflect) MABUTI ANG NASUSULAT
            4.  Magtanong tumawag magtanong sa sumulat ng memo kung hindi nauunawaan
             

           COMMUNICATION ACKNOWLEDGEMENT

           Improvement in Gmail, text  H22026   MC    FL COMMUNICATION

           (Gmail reference number)

           1.    I we have read the above mentioned memo/gmail and  I will________________________(indicate action)
           2.    This memo requires and asks compliance for 

                 1

                 2

                3

SOCP  _________________________________________

Date __________________________________________

N.B -   Baka puwede si Soto candidate sa HGGMP for CSS 1 and doubling at PM for HR doing this monitoring Pefroamnce Evaluation









 The contents are property of the author and shall not be used without written consent

Sunday, January 11, 2026

Abstract Improvement January 10,2026







Ms CCS please send me correct format for abstract (and abstract expandable to sharing) and PNL   (with formula)

  A.    For sharing:

        1.   Less -52% for funds allocation

            =  Net sales

        2    Sharing:

               x%  for land - owner

              y% for developer

     3.     PNL  Land developers

          less Cogs

         P3,500 x area   x 2.5  for lawn   7,500       12 mos    625.00
                                                                            24 mos    288.00
                                                                            36 mos    208.00
                                                                            48 mos    156.25
                                                                           60  mos    125.00

                                 10 sm for ssn                     12 mos     6,250.
                                 35,000                                24 mos    2,888
                                                                            36 mos    2,083
                                                                            48 mos    1,562.25
                                                                            60  mos   1,250
 1
 
                                 30 sm for GE                    12 mos     8,750
                                105,000                              24 mos     4,375
                                                                           36 mos     2,917
                                                                           48 mos     2,187.50
                                                                           60 mos     1,750
                                
               =   GP  (we charge for phase 1 of Calamba and all others the COGS from our share)    Thus we really are suffering from all sharing esp la Union at 50-50.

                     Simulate:

                                       Say 10 plots at La Union    10 x 60,000  =   600,000
                                                     less 52%                                         312,000

                                                    Net sales                                        288,000

                                       Sharing 50%                                              144,000

                                       OUr share                                                  144,000

                                      Less cogs   10 x 3,750                                37,500

                                                                                                        106,500

                                     GP

                                     Less Security                                               50,000

                                    Less Salaries 5 x 16.2                                  81,000

                                    Electricity                  est                               20,000

                                         (others not included)                            151,000
                                    Net Income/loss                                         ( 45,000)



                    less Operating expenses;

                  1.  Security
                  2.  Salaries and wages
                  3.  Ground maintenance
                  4.  Rent/utilities
                       Water
                       Internet
                       Electricity
                  4. Management fee
                 5.  Marketing

       =   EBIT  -  Gross Profit

      Prove counter check with

                 CRB (Cash receipt book)    all revenues compilation for the month

                CASH DISBURSEMENT BOOK

On Sat, Jan 10, 2026 at 4:53 PM Holy Gardens San Carlos <sancarlos@holygardens.ph> wrote:
Good day Mam/Sir,

Please see attached file po

Rosana  

Friday, December 12, 2025

Report on visit to Holy Gardens Pangasinan December 1 and 2

1.  Pre visit while on the bus OTW







    1.  Ms. Rosanna promised to call But did not.  Busy daw with customers but 
        the 0 sales and low collection belie/disagree with her excuse

    2.  Discussed with Sharifa, preparation for the seminar not well understood or does not know how.   Ms. Sharifa could strive more to execute simple things like conducting  a seminar/onboarding

   3   THE GETTING TO KNOW YOU  session revealed a depth of skills and qualification but were not being displayed or practiced by the individuals.  What is needed to be done.  For example Sharifa worked abroad, in Syria, and even in a cruise ship.   That means she met international standards.  But what are the standards being unmet here in the Philippines?

Orientation

   Arrived at 7:00.  Ms. Rosanna came late
   Topics for the day were covered.    Supposed OJT for Aubrey in pm (today
    I discovered that the checklist was not even known by the trainee

    Stayed only only days 1 and 2.  The hotel cost P1,300 (net of SC discount) and had only P5,000 pocket money and with the food and expensive tricycle, it was running out fast

   Decided  to do GMeet  for the rest of the on boarding


SBU

   1  Tall grasses  the old excuse again of no gas.  Grove could facilitate with 
       PCF or revolving fund

   2.  Trashes all around  -  This post even picked up the trash for Sharifa and placed
         for the plenary to see

   3.  CR  -  clean more, repair the broken tiles, fix the flush toilets, and place deodorants -  ambupur, AC Johnson (plaisir

   4.  Vehicle TPM - did not read the post on TPM, improper or no logbooks

A LONGER STAY IS NEEDED FOR SHARIFA OR TO HELP HER WITH  A MORE EXPERIENCED OFFICER

In compliance with procedures in travel

A REPORT IS NEEDED FOR EVERY TRAVEL.  We must make sure the trips (which are expensive) PRODUCE RESULTS.  iT HAS BEEN OBSERVED THAT THIS IS NOT HAPPENING WITH OTHER TRAVELERS