                           COMPARISON OF BACKHOE VS MANUAL DIGGING 
Objectives

      1. To accommodate more interments, more interments = more revenue
      2.  To arrest growth of digging fees which is now inching towards P3,000.00 for 7 ft
      3.  To prevent diggers from holding us hostage to diggers who will just abandon the 
            job (nambibitin)
      4.  Faster and more efficient digging time (1 to 1.5 hours max)

Background:

      1.  This was a project about 2-years old to mechanize operations after we visited the site of Orias at MMP
      2.  We initially canvassed SNY and Kato  Kato cost:   P3,000,000 which can not beat the lower cost of manual labor
      3.  Now comes a post by MTTC who baited us with P140,000 and P185,000 payment (actually downpayment for total cost)
      4.  We want to implement monumenting of plots  to avoid wrong interments, misaligned or clashing plots







Options:

       1.  Arnold Vinas -  2nd hand Komatsu pc 35 costing P870,000   reconditioned

           Pro -  komatsu brand, mas matibay
           Con-  halos kapresyo ng BN na China, wala ng piyesa, we will be plagued by repairs.

       2.  Joshua Ruiz at MTTC pc 35, BN P1,150,000.00  -  China

            Yanmar    Reach                  2.9meters
                            Digging depth  -  2.35 meters (7 ft is 2.22 meters)  PC 20 whose reach is  1.99 only (6.2 ft)  is only P840,000!!  The extra

           May breaker line may available na point +  P80,000

           DP  say 30%  -                                           345,000
           Balance -                                                    805,000
           MA for 36 mos 14% pa                            31,976  (vs 27,777 for pc 20))   4K more monthly vs pc                                                                               20
                   we can self finance this via Majorem para walang lalabas

  Wtdn

1.  Getting the Yanmar BN is a better alternative
2.  Demo of digging at Trece Martires by Wed.
3.   Start with Morong, then  Calamba (those with high rate of interment)  La Union and then Panga

4.  Computation:

       Total cost:            FFE                                       P1,150,000
                                  Transport                                       50,000
                                   Interest                                        346,150

       (Excludes maintenance, fuel lubricants)              1,546,000/60  =  25,766

                                                                    20 interments                                    30 interments                 (Costs are lower if volume is higher)

          Unit cost                                           1,300.00                                               858.00
           Fuel                                                    200.00                                               200.00
           Operator                                             500.00                                               500.00
           Labor                                                 300.00                                               300.00

             Total                                              2,300.00                                            1,858.00

         Gp/savings for 3,000                            700                                                 1,100.00
          pahukay


       GP for 300 interments                     210,000.00                                          330,000.

       ROI for  1,500,000                          7 years      10%                                   5 years     14.4%

       GP + dep +  P303,000                      513,000 =  3 years    24%                633,000    2.4 years    36%
        cash back for ITR      

High ROI;  preferred for high volume operations:   LU, Panga and HGGMP